Unlike many oilseed pages, sunflower needs a byproduct page that separates cake from hulls because dehulling creates another material flow.
Plan sunflower cake, meal, and hull handling around dehulling outlet, cake discharge, cooling, bagging, feed use, hull storage, and dust control.
Cake outlet depends on hull level and residual oil.
Separated hulls need storage, sale, fuel, or disposal plan.
Hull dust should stay away from filling and clean tanks.
Use this page to keep byproducts out of the clear-oil story.
Sunflower Cake, Meal, and Hull Handling should not be quoted from an equipment name alone. Check feed lots, target oil, post-press handling, and packing rhythm in one scope before deciding which Sunflower Oil Press modules stay. Listed on the factory hot-press page — discuss 300/325 first.
When feed condition, moisture, impurities, batch weight, and product position are unclear, press tonnage and filter area become guesswork. Factory systems share 60 MPa and 2.2 kW motors; hot pure press is 30–40 min/barrel and cold pure press is ~2 h/barrel — cycle time matters more than brochure tonnage.
When discussing Sunflower Cake, Meal, and Hull Handling, pin models to published factory specs — not tonnage alone.
Hot 300/325: 300–325 ton, 60 MPa system, standard barrel Ø390×800 mm / max 100 kg, pure press 30–40 min/barrel, ~1.5 h for 2 barrels with loading, 2.2 kW motor. Cold 355/400/426/480/500: 370–630 ton, integrated frame, same 100 kg standard barrel, pure press ~2 h/barrel, ~4.5 h for 2 barrels with loading; optional Ø300 high-pressure barrel max 60 kg. Residual oil target ~≤5% (peanut hot often 6–8% measured).
After Sunflower Cake, Meal, and Hull Handling is clear, write the interfaces: how preparation feeds the press, how oil leaves the press, how filtration connects to tanks, and how packing receives finished oil.
Record feed form, daily volume, moisture, and sorting needs so pretreatment is not left to operators.
Retail sunflower oil needs winterization at 5–8°C × 24–48 h (wax 600–1200 ppm). Keep high-oleic and regular linoleic segregated.
Prepare space, power (often 380V/50Hz/3ph), labor, target package, local rules, and acceptance method before quotation.
Bring feed condition, target output, and site constraints, and we will continue from what this page covers.